26'Billfisher Construction - The Nomad - April 15th 2002


Bulkheads installed, fuel tank will go between these two (67kb) Cabinets laid into hull (60kb) Everything is sealed (79kb) Cabinets in place, hull almost ready to be popped from mold (87kb) Another shot of the cabinets attached to the hull (78kb)
All fitted together (84kb) Tall section of cabinets will eventually be removed for the head door (83kb) Looking aft (62kb)    


Here the bulkheads are completed and the cabinets are fastened to the hull. Preparations are made to lift the hull from the mold.