Nomad Construction


Galley assembled (102kb) Assembled deck and bridge 4.JPG (81kb) Assembled deck and bridge 1.JPG (92kb) Assembled deck and bridge 2.JPG (88kb) Steve working on the transom (64kb)
Assembled to hull (86kb) Looks like she's ready to float! (72kb) bridge on looking forward.JPG (65kb) galley with bridge2.JPG (90kb) galley with bridge.JPG (80kb)
deck on 4.JPG (83kb) deck on 3.JPG (87kb) deck on 2.JPG (90kb) deck on 1.JPG (49kb) trim tabs.JPG (73kb)