Nomad Construction


Fly Bridge is on and masking for painting is started (87kb) another shot of the bow (75kb) Railing added to fly bridge (82kb) Nice gloss on the gel coat (89kb) Bow pulpit has been added (78kb)
View looking forward. Blackman lists the boat specs and attaches it right to the hull. (65kb) Helm station on the fly bridge (50kb) june 21 transom2.JPG (51kb) Trim tabs installed (51kb) View forward (78kb)
Engine box coated and ready (53kb) Galley has a way to go yet (88kb) galley from deck w bridge.JPG (64kb) Fuel tank is installed (60kb) Liner is installed in the bunk area (86kb)